MODEL | 909.6 |
1 | Install left side wall paneling (1), fit and fix in place. |
Glue side wall paneling (1) with side wall flanges (2) and side wall reinforcements (3). |
D63.10-1779-06
2 | Weld left side wall paneling (1) to drip rail (6) (arrows). |
3 | Weld left side wall paneling (1) to corner pillar paneling (5) and front side wall paneling (14) (arrows). |
Complete inert gas welds at intervals holding a steel or copper block from outside, allow to cool down in between. |
Make inert gas welds with a length of approx. 5 mm each at intervals of approx. 30 mm. |
D63.10-1786-12
4 | Weld left side wall paneling (1) to inner side wall (10) (arrows). |
D63.10-1787-12
5 | Weld left side wall paneling (1) to inner front side wall and wheel arch (arrows). |
D63.10-1788-01
6 | Weld left side wall paneling (1) to rear inner side wall and wheel arch (arrows). |
7 | Grind left side wall paneling (1) down flat. |
8 | Restore surface and smooth. |
9 | Remove grinding dust. |
D63.10-1789-01