S60.30-0158-09
1 | Platform cover | 6 | Gas-operated struts | 7 | Mounting bolts |
1 | Platform cover |
2 | Hinge bolt |
3 | Hinges |
4 | Sealing rail |
S60.30-0156-06
| Remove | ||
1 | Open platform cover (1) and dropside | ||
2 | Remove gas-operated struts (6) | Unclip pneumatic springs (6) from mounting bolts (7) of platform cover (1). | |
3 | Remove platform cover (1) | To do this, remove the hinge bolts (2). | |
| Install | ||
4 | Install platform cover (1) | To do this, position hinges (3) of platform cover (1) on cutout (arrow a) of sealing rail (4) and install hinge bolts (2) as shown. | |
5 | Engage hinge bolts (2) in cutout (arrow b) on sealing rail (4) | ||
6 | Install gas-operated struts (6) | Unclip pneumatic springs (6) on mounting bolts (7) of platform cover (1). | |
7 | Close platform cover (1) and dropside |