ar2660d0060tsf

Remove/install shift tower

Typ ar · temat 26.60 · wersja 0200 · 2020-07-21

Dotyczy: Transmission 700.76 in model 910

Niedostępne w języku „pl”; wyświetlono w języku Angielski.

Umiejscowienie

Grupa funkcyjna 2 Podwozie › 26 Mechaniczna skrzynia biegów › 26.60 Mechanizm zmiany biegów — Seria 910

EinPAS 17 Zespół przeniesienia napędu/ oś › 17.35 Zmiana biegów/ sterowanie przełożeniami › 17.35.30 Moduł/dźwignia/drążek/cięgno zmiany biegów — Seria 910

Dotyczy też silników/skrzyń biegów: 700 76*

AR26.60-D-0060TSF

Remove/install shift tower

20.07.2020

Transmission

700.76 in model 910

Modification notes

16.07.2020

Bolt, shift tower to transmission housing

BA26.60-N-1002-01TS

Remove/install shift tower

1

Shift tower

2

Bolts

3

Electrical connector

6

Breather connection

D26.60-A006-76

Remove/install shift tower

D26.60-A007-79

1

Shift tower

4

Shift finger

5

Sealing ring

Caution

Risk of injury to skin and eyes due to handling of transmission oil. Health risk caused by swallowing transmission oil

Wear protective gloves, protective clothing and safety glasses.
Do not pour transmission oil into beverage bottles.

AS00.40-Z-0001-01A

Topical note

Information on preventing damage to electronic components due to electrostatic discharge

AH54.00-P-0001-01A

Topical note

Notes on avoiding damage through contamination and foreign objects

AH00.00-P-5000-01A

Remove/install

1

Operate parking brake.

2

Shift transmission to neutral position.

3

Remove shift cables from transmission.

AR26.60-D-6626-01TSF

4

Disconnect electrical connector (3).

5

Remove bolts (2) .

Bolt, shift tower to transmission housing

*BA26.60-N-1002-01TS

6

Remove shift tower (1).

Installation:
Insert shift tower (1) without tilting it.
Malfunction or damage can occur otherwise.

Installation:
The shift tower (1) must lie flat against the transmission.
Leaks and damage nay occur otherwise.

Removal: Remove shift tower (1) vertically upward.

Installation: The shift fingers (4) must line up with each other as shown.

If necessary,

align shift fingers (4).

7

Remove sealing ring (5).

Installation: Replace sealing ring (5). Make sure that the sealing ring (5) is seated correctly.

Check

8

Check breather connection (6) for damage.

If corresponding findings are present,

replace breather connection (6).

Clean

9

Clean sealing surfaces on shift tower (1).

If shift tower (1) is to be used again.

Cleaner

*BR00.45-Z-1025-04A

10

Clean sealing surfaces on transmission.

Cleaner

*BR00.45-Z-1025-04A

11

Install in the reverse order.

12

Teach in neutral gear sensor of shift tower (1) using diagnostic device.

Connect/disconnect diagnostic unit

AD00.00-D-2000-06TS

Check

13

Check that gearshift system is functioning correctly.

If it is functioning incorrectly

Determine and eliminate cause.

Shift

Number

Designation

Model 910 with transmission 700.76

BA26.60-N-1002-01TS

Bolt, shift tower to transmission housing

Nm

26

Repair materials

Number

Designation

Order number

BR00.45-Z-1025-04A

Cleaner

A 005 989 19 71

Powiązane dokumenty