Modification notes |
17.01.2017 | Screw/bolt, charge air pipe with throttle valve actuator/intermediate flange to charge air line | Engine 651 in model 447 | BA09.41-N-1016-01M |
17.01.2017 | Schraube Ladeluftrohr mit Drosselklappensteller/Zwischenflansch an Ladeluftleitung | Motor 651 im Typ 447 | BA09.41-N-1016-01M |
15.02.2017 | Method extended | Operation step 7 |
S09.41-4638-09
1 | Exhaust gas recirculation line | 4 | Valve | 7 | Bracket | ||
2 | Screw/bolts | 5 | Charge air pipe | 8 | Screw/bolt | ||
3 | Electrical connection | 6 | Electrical wiring harness | 9 | Screw/bolts |
| Remove/install | ||
1 | Remove exhaust gas recirculation cooler | ||
2 | Remove bracket (7) | Remove screw/bolt (8) to do this. | |
3 | Remove exhaust gas recirculation line (1) | Installation: Replace seals. | |
Bolt, exhaust gas recirculation line to bypass flap | |||
Bolt, exhaust gas recirculation line to charge air line | |||
4 | Disconnect electrical connection (3) | ||
5 | Remove valve (4) | The connections are not disassembled. | |
6 | Remove screw/bolts (2) | Screw/bolt, charge air pipe to charge air distributor | |
Screw/bolt, charge air pipe to mounting plate | |||
7 | Unscrew screw/bolts (9) | ||
Installation: Observe tightening procedure of screw/bolts (9). | |||
Screw/bolt, charge air pipe with throttle valve actuator/intermediate flange to charge air line | |||
8 | Remove charge air pipe (5) | To do this remove electrical wiring harness (6), lay down to the side and remove charge air pipe (5). | |
Installation: Replace seal. | |||
9 | Install in the reverse order |
Powiązane dokumenty
- ar0941s133001e Schemat dokręcania nastawnika przepustnicy
- ar1420s7665e