ar0510p760102fg

Riveting timing chain

Typ ar · temat 05.10 · wersja 0100 · 2005-05-11

Dotyczy: ENGINE 639.9 in MODEL 454.0

Niedostępne w języku „pl”; wyświetlono w języku Angielski.

Umiejscowienie

Grupa funkcyjna 1 Silnik › 05 Sterowanie pracą silnika › 05.10 Napęd łańcuchem rozrządu, napęd paskiem zębatym — Seria 454 (modele 0**) · Seria 639 (modele 9**)

EinPAS 15 Silnik › 15.17 Rozrząd silnika › 15.17.34 Napęd łańcuchowy/ pasek zębaty/ napęd kołami zębatymi — Seria 454 (modele 0**) · Seria 639 (modele 9**)

AR05.10-P-7601-02FG

Riveting timing chain

Riveting timing chain
Riveting timing chain
Riveting timing chain
Riveting timing chain

602 589 00 39 00

Thrust piece

Riveting tool

Case

Guide

602 589 00 98 00

602 589 03 63 00

640 589 01 63 00

Riveting timing chain

Hold-down device

640 589 01 40 00

Riveting timing chain

P05.10-2327-11

Proceed with the attached hold-down device (4).

1 Connect the ends of the new timing chain (1) with a new riveted link (7).

Insert riveted link (7) from the rear.

Riveting timing chain

P05.10-2328-01

2 Place guide (8) with digit F6 into the rivet press tool (9) and fix in place.

Riveting timing chain

P05.10-2329-01

3 Insert thrust piece (10) with digit D8 into the rivet press tool (9).

Riveting timing chain

P05.10-2330-01

4 Insert new outer plate (11) into the thrust piece (10).

The outer plate (11) is held by a magnet.

Riveting timing chain

P05.10-2331-01

5 Position riveting tool (9) so that the spacer webs (arrow) are making contact.

6 Tighten spindle at riveting tool (9) until a firm resistance is felt.

When turning the spindle, ensure that the pins of the riveted link move into the holes of the outer plate.

7 Take off rivet press tool (9).

Riveting timing chain

P05.10-2332-01

8 Turn thrust piece (10) with the digit D8 on the riveted link (arrow).

Riveting timing chain

P05.10-2333-01

9 Position riveting tool (9) exactly above the middle of the pins (arrow).

10 Tighten spindle at the riveting tool (9) fully.

Tightening torque of the spindle: reference value of around 30-35 Nm.

11 Rivet the second pin in the same way.

12 Take off rivet press tool (9).

Riveting timing chain

D18.10-1014-01

13 Inspect riveting (arrows), re-rivet if necessary.

14 Remove the rag from the chain slot and the cylinder head.