ar0010s0006c

Check pressure regulator

Typ ar · temat 00.10 · wersja 0102 · 2016-09-15

Dotyczy: Model 639.813 with code ZK7 (Equipment line MARCO POLO) Document only valid for China

Niedostępne w języku „pl”; wyświetlono w języku Angielski.

Umiejscowienie

Grupa funkcyjna 0 Wszystko › 00 Cały pojazd › 00.10 Pojazd kompletny, dane techniczne, badania ustawowe — Seria 639 (modele 813)

EinPAS 21 Hamulce/instalacja podciśnieniowa/układ sprężonego powietrza › 21.35 Układ sprężonego powietrza › 21.35.30 Suszenie/regulacja/czyszczenie — Seria 639 (modele 813)

AR00.10-S-0006C

Check pressure regulator

08.09.2016

Model

639.813

with code ZK7 (Equipment line MARCO POLO)

Document only valid for China

Modification notes

24.08.2016

Safety notice replaced

Notice block before work description

Check pressure regulator

1

Organizer bag

2

Rotating cabinet

N00.10-2554-11

Check pressure regulator

3

Cover

4

Quick-release couplings

5

Valve

6

Pressure regulator

7

Hose line

8

Date of manufacture

9

Connections

N00.10-2565-06

Danger !

Risk of explosion due to escaping combustible gas or overheating of gas cylinders.Risk of injury caused by burns to skin and eyes. Risk of frostbite to body parts caused by escaping gas and by touching components near the valves when emptying gas cylinders. Risk of poisoning or suffocation caused by inhaling gas.

Remove any sources of ignition.
Protective clothing, safety gloves and safety glasses must always be worn.
Ensure that the work area is adequately ventilated.
When working on vehicles at ambient temperatures over 60 °C, all gas cylinders must be removed.

AS00.00-Z-0018-01A

Remove/install

1

Remove organizer bag (1)

2

Fold up rotating cabinet (2)

3

Remove cover (3)

Do this by opening the quick-release fittings (4).

Installation: Check for correct installation position of cover (3).

4

Close the valve (5)

5

Unscrew pressure regulator (6) from valve (5)

When hose lines and pipes are still being tested during the gas test, the pressure regulator (6), must not be installed until these test sections have been completed.

Threaded connection is a left-hand thread.

6

Unscrew hose line (7) from pressure regulator (6)

Threaded connection is a left-hand thread.

Check

7

Check manufacturing date (8)


After expiry of 10 a the pressure control device (6) and the hose line (7) have to be replaced.
Otherwise, the safety of the gas system can no longer be assured.

Use genuine MB parts only.

8

Check connections (9) of pressure regulator (6) for cleanliness

9

Install in the reverse order

Powiązane dokumenty