ar0010s0003c

Check cylinder storage space

Typ ar · temat 00.10 · wersja 0102 · 2016-09-15

Dotyczy: Model 639.813 with code ZK7 (Equipment line MARCO POLO) Document only valid for China

Niedostępne w języku „pl”; wyświetlono w języku Angielski.

Umiejscowienie

Grupa funkcyjna 0 Wszystko › 00 Cały pojazd › 00.10 Pojazd kompletny, dane techniczne, badania ustawowe — Seria 639 (modele 813)

EinPAS 10 Serwis › 10.20 Ustawowe badania/ przepisy prawne › 10.20.30 Testy — Seria 639 (modele 813)

EinPAS 37 Wyposażenie wnętrza › 37.76 Kuchnia pokładowa/ lodówka › 37.76.50 Zasilanie gazem — Seria 639 (modele 813)

AR00.10-S-0003C

Check cylinder storage space

08.09.2016

Model

639.813

with code ZK7 (Equipment line MARCO POLO)

Document only valid for China

Modification notes

24.08.2016

Safety notice replaced

Notice block before work description

Check cylinder storage space

1

Organizer bag

2

Rotating cabinet

N00.10-2554-11

Check cylinder storage space

3

Cover

4

Quick-release couplings

8

Seal

10

Warning

N00.10-2558-06

Check cylinder storage space

N00.10-2561-09

5

Valve

7

Gas cylinder

11

Gas lines

6

Pressure regulator

9

Aeration/ventilation

Danger !

Risk of explosion due to escaping combustible gas or overheating of gas cylinders.Risk of injury caused by burns to skin and eyes. Risk of frostbite to body parts caused by escaping gas and by touching components near the valves when emptying gas cylinders. Risk of poisoning or suffocation caused by inhaling gas.

Remove any sources of ignition.
Protective clothing, safety gloves and safety glasses must always be worn.
Ensure that the work area is adequately ventilated.
When working on vehicles at ambient temperatures over 60 °C, all gas cylinders must be removed.

AS00.00-Z-0018-01A

Remove/install

1

Remove organizer bag (1)

2

Fold up rotating cabinet (2)

3

Remove cover (3)

Do this by opening the quick-release fittings (4).

Installation: Check for correct installation position of cover (3).

4

Close the valve (5)

5

Unlock pressure regulator (6)

When the pressure regulator (6), hose lines, and pipes are still being tested during the gas test, the gas cylinder (7) may not be installed until these test sections have been completed.

Threaded connection is a left-hand thread.

6

Remove gas cylinder (7)


Proceed with caution when removing and inserting the gas cylinder (7).
Otherwise, the rotating cabinet (2) may be damaged.

Check

7

Check whether the warning note (10) is present

8

Check the gas cylinder model

The gas cylinder model must match the model specified on the warning note (10).

9

Check seal (8) of cover (3) for damage

10

Check aeration and ventilation (9)

Aeration/ventilation (9) shall not be lockable.

11

Visually inspect the gas lines (11)

12

Install in the reverse order

Powiązane dokumenty