ar6320d000202a

Preparing right B-pillar paneling bottom section for installation

Type ar · thema 63.20 · versie 0109 · 2006-10-31

Geldig voor: MODEL 901.32 /42 /62, 902.32 /42 /62, 903.02 /32 /42 /62, 904.32 /42 /62, 905.62 MODEL XD2, XD3, XD4, XD5, XD6, XD7 MODEL 903.62, 904.62 with CODE (ZU9) National version for Mexico

Niet beschikbaar in “nl”; getoond in Engels.

Plaats

Functiegroep 3 Opbouw/carrosserie › 63 Zijpaneel › 63.20 Stijlen — Serie 901 (modellen 32*, 42*, 62*) · Serie 902 (modellen 32*, 42*, 62*) · Serie 903 (modellen 02*, 32*, 42*, 62*) · Serie 904 (modellen 32*, 42*, 62*) · Serie 905 (modellen 62*)

EinPAS 35 Carrosserie/chassis/stylingaccessoires › 35.34 Zijwand › 35.34.45 Stijl — Serie 901 (modellen 32*, 42*, 62*) · Serie 902 (modellen 32*, 42*, 62*) · Serie 903 (modellen 02*, 32*, 42*, 62*) · Serie 904 (modellen 32*, 42*, 62*) · Serie 905 (modellen 62*)

AR63.20-D-0002-02A

Preparing right B-pillar paneling bottom section for installation

Workshop equipment

WE58.40-Z-1003-03A

Angle grinder (electric/pneumatic)

WE58.40-Z-1004-03A

Body saw (electric/pneumatic)

Repair materials

Number

Designation

Order number

BR00.45-Z-1001-07A

Zinc dust paint suitable for spot welding

A 000 986 34 42

Preparing right B-pillar paneling bottom section for installation

D63.20-0056-06

1 Mark separation lines (dotted lines, 3) on door frame paneling (4) with the following dimensions:

a = approx. 25 mm,

b = approx. 260 mm.

2 Separate right B-pillar paneling bottom section (1) along marked separation lines (dotted lines, 3).

Preparing right B-pillar paneling bottom section for installation

D63.20-0057-11

3 Grind down paneling (1) in marked area on both sides and coat with zinc dust paint.

4 Position paneling (1), align and clamp in place.