P68.30-3111-07
Shown on left A-pillar
1 Edge guard
2 A-pillar paneling
3 Guides
5 Instrument panel
P68.30-3112-12
Shown on left A-pillar
3 Guides
4 Retaining clips
5 Instrument panel
6 Retaining clamp
Modification notes
| Remove/install | ||
1 | Remove edge guard (1) in area of A-pillar paneling (2) | Installation: Ensure that edge guard is seated correctly. | |
2 | Press A-pillar paneling (2) off of retaining clips (4) and retaining clip (6) with mounting wedge | Removal: Position mounting wedge directly to retaining clips (4) | |
Installation: Check retaining clips (4), replace if necessary | |||
Installation: Ensure that retaining clips (4) and retaining clip (6) (arrow B) are seated correctly. | |||
Mounting wedge | |||
3 | Remove A-pillar paneling (2) upward from instrument panel (5) | Installation: Guides (3) should engage in instrument panel (5) (arrows A). | |
Installation: Observe installation position of check strap. | |||
4 | Install in the reverse order |
Wedge tool
110 589 03 59 00