055 589 02 33 00
Puller
1 | Install the extraction plate (3) on the pinion shaft (1) base, so that it supports the bearing from below |
2 | Remove the bearing using a press |
Install the flange nut (2) on the pinion (1). The nut prevents the pinion from falling when removing the bearing. |
B35.30-0163-01
B35.30-0136-01
3 | Heat the bearing to a temperature of approximately 80 °C |
4 | Install the bearing (4) onto the pinion shaft (1) |
Observe the correct seating of the bearing. |
Work with a protective sleeve when inserting the hot bearing in the pinion shaft. |
B35.30-0116-01