gf9800u2300a

Painting/corrosion protection, Bremen plant

Tipo gf · tema 98.00 · versione 0101 · 2000-09-25

Valido per: MODEL 129, 170, 202, 208

Non disponibile in “it”; mostrato in USA-Inglese.

Collocazione

Gruppo funzionale 3 Carrozzeria › 98 Vernice › 98.00 Generalità — Serie 129 · Serie 170 · Serie 202 · Serie 208

GF98.00-U-2300A

Painting/corrosion protection, Bremen plant

1.10.98

MODEL 129, 170, 202, 208

The following passenger car series are produced at the Mercedes-Benz Bremen plant

Model 129 (SL class)

Model 170 (SLK class)

Model 202 (C class)

Model 208 (CLK class)

The following two charts show the corrosion protection processes in the Bremen plant, starting with the pre-treatment of the body-in-white through to assembly of the painted and protected body. The temperatures specified relate to the target temperature of the bodies.

Models R 129 and R 170 are painted on a different production line, but the sequence of production operations is basically identical.

-----------------------------------------------------------------------------------------

The first chart shows the process sequence for the use of water-based paint, the second chart shows the sequence for paints containing solvents.

The following chapters or documents show how reliable corrosion protection is achieved for passenger cars produced in Bremen through desiged processes, sequences of operations during production, painting processes and the use of special materials.

The transport film is offered as special equipment to protect the painted surface from damage:

Material: PEPP

Processing method: Affixed manually before assembly

Film thickness: approx. 50 - 70 μm

Function: Assembly and transport protection

-----------------------------------------------------------------------------------------

Painting/corrosion protection, Bremen plant

P98.00-2257-09

Water-Based paint

A Manual

1 Pre-treatment (cleaning)

2 Cataphoretic immersion priming (KTL)

3 KTL Drier, 175°C, 15 min.

4 Sanding KTL (flaws only)

5 Body seam sealing (NAD)

12 Intermediate drier

13 Application of clear coat 2K (ESTA)

14 Top coat drier, 130°C, 22 min.

15 Cooling zone

16 Cavity protection (IGS)

17 Wax drier, 50°C, 6 min.

6 Underbody protection (UBS)

7 UBS/NAD drier, 155°C, 15 min.

8 Filler application (ESTA)

9 Filler drier, 155°C, 20 min.

10 Sanding fillre (flaws only)

11 Water-based paint base coat application (ESTA)

Painting/corrosion protection, Bremen plant

P98.00-2258-09

Base paint containing solvents

A Manual

1 Pre-treatment (cleaning)

2 Cataphoretic immersion priming (KTL)

3 KTL Drier, 175°C, 15 min.

4 Sanding KTL (flaws only)

11 Base coat application (pneumatic)

12 Application of clear coat 1K (ESTA)

13 Top coat drier, 130°C, 22 min.

14 Cooling zone

15 Cavity protection (IGS)

16 Wax drier, 50°C, 6 min.

5 Body seam sealing (NAD)

6 Underbody protection (UBS)

7 UBS/NAD drier, 155°C, 15 min.

8 Filler application (ESTA)

9 Filler drier, 155°C, 20 min.

10 Sanding fillre (flaws only)

Painting/corrosion protection, Bremen plant

P98.00-0706-06

Paint structure, layer thicknesses:

1 Steel sheet

2 Zinc-phosphatizing approx. 2.5 g/m2

3 Electro-dipcoat emersion 18 - 20 μm

4 Primer/Filler

on vertical surfaces 30 35 μm

on horizontal surfaces 30 35 μm

Solid color water-based paint

5 Base coat 20 5 μm

Metallic base coat

5 Base paint containing
solvents 13 2 μm

5 Water-based base coat 13 2 μm

Clear coat

6 1K clear coat (base paint
containing solvents)

on vertical surfaces 33 2 μm

on horizontal surfaces 43 2 μm

6 2K clear coat (water-based paint)

on vertical surfaces 33 2 μm

on horizontal surfaces 43 2 μm

Paintwork structure

Painting/corrosion protection series production - General

GF98.00-U-2000A

Contents, color lists

All models and plants, color charts and contrasting colors

GF98.00-U-8299A

Color lists

General information

GF98.00-U-8200A

Documenti citati