P63.20-6168-06
1 Install C-pillar paneling (1), fit and fasten using vise grip pliers and C-clamps.
2 Position rear roof frame (2) and mark holes for plug welding in area A on C-pillar paneling (1)
3 Remove C-pillar paneling (1) and drill marked holes in area A on C-pillar paneling (1).
4 Install C-pillar paneling (1), fit and fasten using vise grip pliers and C-clamps.
Check course and condition of sealant, correct if necessary.
P63.20-6169-06
5 C-pillar paneling (1) in illustrated areas .
P63.20-6170-12
6 C-pillar paneling (1) in illustrated areas .
P63.20-6171-06
7 C-pillar paneling (1) in illustrated areas .
P63.20-6172-06
8 C-pillar paneling (1) in areas B and C .
Weld trough inert gas welds in areas B and C. Perform welding in intervals, allow to cool down in between. This ensures minimum heat distortion.
9 Grind inert gas welds down flat in areas B and C and clean with wire brush.
10 Grind all required spot welds down flat
11 Clean all other spot welds with wire brush
P63.20-6173-06
12 Fill unevenness in cross-hatched areas on C-pillar paneling (1) with filling solder and then grind down flat.