P63.10-3572-09
1 Grind mating surfaces in areas A to F down to bare metal on one side.
2 Grind connection surface down to bare metal in area G on both sides. Coat inside of spot welding flanges with zinc dust paint.
P63.10-3573-05
3 Grind connection surface down to bare metal in area H on one side
4 Grind connection surface on front roof frame down to bare metal in area J on both sides
P63.10-3574-04
5 Grind connection surface down to bare metal on one side in area K
6 Grind connection surface on rear roof frame down to bare metal in area L on both sides.
P63.10-3575-12
7 Grind connection surface down to bare metal in area M to P on one side
8 Apply sealant to connection surface of tank fitting recess (1).
Ensure that bead applied is sufficiently high.