Operation no. of operation texts or standard texts and flat rates
Category | Op. no. | Operation text |
P | 024762 | Disconnect/connect Diagnostic Assistance System (DAS) |
P | 025058 | Connect and disconnect battery charger (with DAS connected) |
P | 026340 | Load software for instrument cluster (with DAS connected) |
| List of affected vehicles | Model 212 from | |
| Remove/install | ||
1 | Connect DAS | If DAS is already connected, proceed with operation step 2. | |
Use DAS version 03/2009 or higher version. | |||
It is absolutely essential to closely follow the steps as per DAS. | |||
2 | Connect battery charger | Using the battery charger ensure an adequate power supply (at least 12.5 V) of the on-board electrical system battery. | |
3 | Install software for instrument cluster (A1) | Select menu item "control unit programming". | |
4 | Disconnect DAS |
Referenced documents
- ad0000p200004a Connect STAR DIAGNOSIS and read out fault memory
- ad0000p200004a
- sm5430p001001aaa Affected vehicles: Install software for instrument cluster