PP07.61-P-5000MOS | ME-SFI pneumatic diagrams | 5.5.08 |
ENGINE 275.953 in MODEL 216.376, 221.176 as of Model Year 09 /AEJ 08
ENGINE 275.982 in MODEL 216.379, 221.179 as of Model Year 09 /AEJ 08
P07.61-2728-09
5/2 Charge air cooler for right cylinder bank
12 Intake manifold
22 Vacuum reservoir
110/3 Boost pressure control valve with vacuum cell
110/4 Deceleration air valve
Y31/5 Boost pressure control pressure transducer
Y32 Air pump switchover valve
Y101 Divert air switchover valve
a Ambient pressure
B Test connection of deceleration recirculating air control
110 A Left turbocharger
110b Right turbocharger
126/1 LH air shutoff valve (integrated check valve)
126/2 RH air shutoff valve (integrated check valve)
128 Check valve (vacuum)
As assembly material for hose lines only Isopropanol or Palationol are permissible. In any case do not use oil or grease. Lines with overpressure can slip off and residues of grease can bond with check valves and drillings.
Study hose lines and connection pieces for cracks.
The hose lines must be secured with clamps. During assembly work, carefully and clearly mark all hose connections that are to be detached.