pe5410p2104fca

Wiring diagram for battery management control unit

Type pe · topic 54.10 · version 0101 · 2019-04-19

Applies to: Model 253.99 as of model year 2019 with code 9O1 (Fuel cell pre-installation) except code ME05 (HYBRID DRIVE 80KW VARIANT (INCLUDING PLUGIN)) Control unit N82/2

Where it sits

Function group 2 Chassis › 54 Electrical system, equipment and instruments › 54.10 Battery, power supply, voltage converter — Series 253 (models 99*)

EinPAS 16 Fuel/power supply to engine › 16.20 High-voltage on-board electrical system › 16.20.11 Control unit/relay — Series 253 (models 99*)

PE54.10-P-2104FCA

Wiring diagram for battery management control unit

15.04.2019

Model

253.99

as of model year 2019

with code 9O1 (Fuel cell pre-installation)

except code ME05 (HYBRID DRIVE 80KW VARIANT (INCLUDING PLUGIN))

Control unit N82/2

Wiring diagram for battery management control unit

PE54.10-P-2104-97FCA

Arrangement of electrical connectors

GF00.19-P-1005FCA

Location of ground points

GF00.19-P-2002FCA

Location of end sleeves

GF00.19-P-3005FCA

Abbreviations of signal and circuit designations for wiring diagrams

OV00.01-P-1001-28FCA

Use of wiring diagrams

OV00.01-P-1901-03FCA

Search aid for all electrical components

OV00.01-P-1909FCA

Referenced documents