pe5410p2104fbc

Wiring diagram for battery management control unit

Type pe · topic 54.10 · version 0103 · 2019-03-27

Applies to: Model 253 (except 253.99) up to model year 2020 with code ME05 (HYBRID DRIVE 80KW VARIANT (INCLUDING PLUGIN))

Where it sits

Function group 2 Chassis › 54 Electrical system, equipment and instruments › 54.10 Battery, power supply, voltage converter — Series 253 (models 14*, 18*, 30*, 31*, 32*, 34*, 35*, 36*, 38*, 90*, 91*, 92*, 94*, 95*, 96*, 98*)

EinPAS 16 Fuel/power supply to engine › 16.20 High-voltage on-board electrical system › 16.20.11 Control unit/relay — Series 253 (models 14*, 18*, 30*, 31*, 32*, 34*, 35*, 36*, 38*, 90*, 91*, 92*, 94*, 95*, 96*, 98*)

PE54.10-P-2104FBC

Wiring diagram for battery management control unit

26.03.2019

Model

253 (except 253.99)

up to model year 2020

with code ME05 (HYBRID DRIVE 80KW VARIANT (INCLUDING PLUGIN))

Wiring diagram for battery management control unit

PE54.10-P-2104-97FBC

Abbreviations of signal and circuit designations for wiring diagrams

OV00.01-P-1001-28FBA

Use of wiring diagrams

OV00.01-P-1901-03FBA

Search aid for all electrical components

OV00.01-P-1909FBA

Location and assignment of line and plug connectors

GF00.19-P-1000FBA

Location and assignment of ground points

GF00.19-P-2000FBA

Location and assignment of Z connector sleeves (wiring and plug connectors in wiring harness)

GF00.19-P-3000FBA

Referenced documents