pe5410p2104fbb

Wiring diagram for battery management control unit

Type pe · topic 54.10 · version 0105 · 2018-04-13

Applies to: Model 205 up to model year 2019 with code ME06 (Hybrid drive 60 kW variant (incl. plugin)) except code ME04 (Mild hybrid drive)

Where it sits

Function group 2 Chassis › 54 Electrical system, equipment and instruments › 54.10 Battery, power supply, voltage converter — Series 205

EinPAS 16 Fuel/power supply to engine › 16.20 High-voltage on-board electrical system › 16.20.11 Control unit/relay — Series 205

PE54.10-P-2104FBB

Wiring diagram for battery management control unit

12.04.2018

Model

205

up to model year 2019

with code ME06 (Hybrid drive 60 kW variant (incl. plugin))

except code ME04 (Mild hybrid drive)

Wiring diagram for battery management control unit

PE54.10-P-2104-97FBB

Location and assignment of line and plug connectors

GF00.19-P-1000FBA

Location and assignment of ground points

GF00.19-P-2000FBA

Location and assignment of Z connector sleeves (wiring and plug connectors in wiring harness)

GF00.19-P-3000FBA

Abbreviations of signal and circuit designations for wiring diagrams

OV00.01-P-1001-28FBA

Use of wiring diagrams

OV00.01-P-1901-03FBA

Search aid for all electrical components

OV00.01-P-1909FBA

Referenced documents