ar9720d1500f

Cavity preservation following repair work

Type ar · topic 97.20 · version 0100 · 2013-02-13

Applies to: MODEL 909

Where it sits

Function group 3 Body › 97 Body sealing, corrosion protection › 97.20 Preservation — Series 909

EinPAS 40 Preservation/paintwork › 40.20 Corrosion protection › 40.20.40 Cavity preservation — Series 909

AR97.20-D-1500F

Cavity preservation following repair work

25.01.2013

MODEL

909

Cavity preservation following repair work

N98.00-0635-09

1

Box/crew bus frame

Danger !

Risk of explosion and poisoning caused by solvent vapors and gasses. Risk of injury to skin and eyes when working with anticorrosion agents

Never spray corrosion protection agents into flames or onto hot objects; keep well away from all potential sources of ignition. Work in well-ventilated areas; wear respiratory protection.

AS97.00-Z-0001-01A

Notes on cavity preservation

AH97.20-P-0001-01B

Cavity preservation following repair work

1

Apply wax to crosshatched areas (A)

Processing instructions for cavity preservation agent

AP97.20-D-0640-01F

Apply wax only after sealing and paintwork, however, before assembly.

2

Apply wax two times in sequence after a flash-off time of 5 minutes in crosshatched areas (A)

Processing instructions for cavity preservation agent

AP97.20-D-0640-01F

3

After flash-off remove wax from drain holes

Processing instructions for cavity preservation agent

AP97.20-D-0640-01F

Additional preservation measures may be required, depending on the repair area, deviating from the standard cavity preservation shown.

Referenced documents