ar7720p1900a

Remove, install tilting/sliding roof cutout seal

Type ar · topic 77.20 · version 0107 · 2012-04-17

Applies to: MODEL 463.220 /221 /222 /224 /225 /227 /228 /230 /231 /232 /233 /240 /241 /243 /244 /245 /246 /247 /248 /249 /270 /271 /320 /321 /322 /323 /324 /325 /327 /328 /330 /331 /332 /333 /336 /340 /341 with CODE (D27) Power tilting/sliding roof MODEL 463.236 /237 /346 with CODE (D27) Power tilting/sliding roof up to model year 2013 /model refinement package 2012

Where it sits

Function group 3 Body › 77 Sliding roof, soft top, top attachments › 77.20 Electric sliding roof — Series 463 (models 220, 221, 222, 224, 225, 227, 228, 230, 231, 232, 233, 236, 237, 240, 241, 243, 244, 245, 246, 247, 248, 249, 270, 271, 320, 321, 322, 323, 324, 325, 327, 328, 330, 331, 332, 333, 336, 340, 341, 346)

EinPAS 38 Roof system › 38.15 Sliding roof/panoramic sliding sunroof › 38.15.50 Sliding roof, complete — Series 463 (models 220, 221, 222, 224, 225, 227, 228, 230, 231, 232, 233, 236, 237, 240, 241, 243, 244, 245, 246, 247, 248, 249, 270, 271, 320, 321, 322, 323, 324, 325, 327, 328, 330, 331, 332, 333, 336, 340, 341, 346)

AR77.20-P-1900A

Remove, install tilting/sliding roof cutout seal

22.3.12

MODEL 463.220 /221 /222 /224 /225 /227 /228 /230 /231 /232 /233 /240 /241 /243 /244 /245 /246 /247 /248 /249 /270 /271 /320 /321 /322 /323 /324 /325 /327 /328 /330 /331 /332 /333 /336 /340 /341 with CODE (D27) Power tilting/sliding roof

MODEL 463.236 /237 /346
with CODE (D27) Power tilting/sliding roof
up to model year 2013
/model refinement package 2012

Remove, install tilting/sliding roof cutout seal

P77.20-0295-06

1 Sealing

2 Front retaining rail

3 Left retaining rail

4 Right retaining rail

5 Rear retaining rail

6 Screw

7 Screw

8 Screw

Remove/install

1

Fully open tilting/sliding roof

2

Mark installation position of seal (1) on roof cutout and connection points (arrows)

3

Remove sealing (1)

Installation: Press seal (1) into retaining rails (2, 3, 4, 5). Connection points (arrows) on seal (1) should coincide with the markings on the roof cutout. The corrugation on the insert profile should point upward.

4

Install in the reverse order