ar6520w100604c

Prepare front roof frame for installation

Type ar · topic 65.20 · version 0100 · 2006-10-31

Applies to: BODY 375.810 in MODEL 375.3 with CODE (DD5) Cab with high roof BODY 375.830 in MODEL 375.1 with CODE (DD5) Cab with high roof BODY 375.840 in MODEL 375.4 with CODE (DD5) Cab with high roof BODY 940.899 in MODEL 950.5 /6, 952.5 /6, 953.6, 954.5 with CODE (DD5) Cab with high roof BODY 944.899 in MODEL 944.0 /2 with CODE (DD5) Cab with high roof BODY 972.899 in MODEL 970, 972, 974, 975, 976 with CODE (DD5) Cab with high roof

Where it sits

Function group 3 Body › 65 Roof › 65.20 Roof frame — Series 375 (models 1**, 3**, 4**, 810, 830, 840) · Series 940 (models 899) · Series 944 (models 0**, 2**, 899) · Series 950 (models 5**, 6**) · Series 952 (models 5**, 6**) · Series 953 (models 6**) · Series 954 (models 5**) · Series 970 · Series 972 · Series 974 · Series 975 · Series 976

EinPAS 35 Body/frame/detachable parts › 35.39 Roof › 35.39.30 roof paneling/roof frame — Series 375 (models 1**, 3**, 4**, 810, 830, 840) · Series 940 (models 899) · Series 944 (models 0**, 2**, 899) · Series 950 (models 5**, 6**) · Series 952 (models 5**, 6**) · Series 953 (models 6**) · Series 954 (models 5**) · Series 970 · Series 972 · Series 974 · Series 975 · Series 976

AR65.20-W-1006-04C

Prepare front roof frame for installation

Commercially available tools

Number

Designation

WH58.30-Z-1001-03A

Round wire brush, braided, dia. 70 mm

WH58.30-Z-1024-04A

Abrasive disk, dia. 115 mm, 80 m/s (max. 13,250 rpm)

WH58.30-Z-1001-40A

Tarp (fire-resistant)

Workshop equipment

WE58.40-Z-1001-03A

Drill (electric/pneumatic)

WE58.40-Z-1003-03A

Angle grinder (electric/pneumatic)

WE58.40-Z-1005-03A

Wet/dry vacuum cleaner

Repair materials

Number

Designation

Order number

BR00.45-Z-1001-07A

Zinc dust paint suitable for spot welding

A 000 986 34 42

Prepare front roof frame for installation

W65.20-1028-04

1 Grind spot welding flanges down to bare metal on both sides in shaded areas and coat insides of spot welding flanges with zinc dust paint.

Prepare front roof frame for installation

W65.20-1029-04

2 Grind connection surfaces down to bare metal in areas A and B.

3 Grind spot welding flanges down to bare metal on both sides in shaded areas and coat insides of spot welding flanges with zinc dust paint.