ar6310w080702b

Prepare side wall, longitudinal member and floor panel connection surfaces for installation

Type ar · topic 63.10 · version 0100 · 2006-10-31

Applies to: BODY 943.899 with CODE (F15) MEGASPACE cab BODY 943.899 with CODE (F04) Cab L (long)

Where it sits

Function group 3 Body › 63 Side wall › 63.10 Side wall — Series 943 (models 899)

EinPAS 35 Body/frame/detachable parts › 35.32 Substructure › 35.32.35 floor assembly/substructure frame — Series 943 (models 899)

EinPAS 35 Body/frame/detachable parts › 35.34 Sidewall › 35.34.35 Fender/sidewall — Series 943 (models 899)

EinPAS 35 Body/frame/detachable parts › 35.34 Sidewall › 35.34.41 Carrier/wheel well — Series 943 (models 899)

AR63.10-W-0807-02B

Prepare side wall, longitudinal member and floor panel connection surfaces for installation

Commercially available tools

Number

Designation

WH58.30-Z-1001-03A

Round wire brush, braided, dia. 70 mm

WH58.30-Z-1024-04A

Abrasive disk, dia. 115 mm, 80 m/s (max. 13,250 rpm)

WH58.30-Z-1001-40A

Tarp (fire-resistant)

Workshop equipment

WE58.40-Z-1001-03A

Drill (electric/pneumatic)

WE58.40-Z-1003-03A

Angle grinder (electric/pneumatic)

WE58.40-Z-1005-03A

Wet/dry vacuum cleaner

Repair materials

Number

Designation

Order number

BR00.45-Z-1001-07A

Zinc dust paint suitable for spot welding

A 000 986 34 42

Prepare side wall, longitudinal member and floor panel connection surfaces for  
	installation

W63.10-1089-09

1 Grind connection surfaces in areas A to F down to bare metal on one side.

2 Grind connection surfaces in area G down to bare metal on both sides.

Prepare side wall, longitudinal member and floor panel connection surfaces for  
	installation

W63.10-1088-06

3 Grind connection surfaces in areas H to M down to bare metal on both sides.

4 Grind connection surfaces in areas N to S down to bare metal on one side.

Prepare side wall, longitudinal member and floor panel connection surfaces for  
	installation

W63.10-1087-09

5 Grind connection surfaces in areas T to V down to bare metal on both sides.

6 Sand down to bare metal spot weld flanges in the shaded areas on both sides.

7 Coat insides of spot welding flange in shaded areas with zinc dust paint.

Prepare side wall, longitudinal member and floor panel connection surfaces for  
	installation

W63.10-1086-04

8 Grind connection surfaces in areas W and X down to bare metal on one side.

9 Grind connection surfaces in area Y down to bare metal on both sides.