ar6310w080702a

Prepare side wall, longitudinal member and floor panel connection surfaces for installation

Type ar · topic 63.10 · version 0100 · 2006-10-31

Applies to: BODY 942.899 with CODE (F04) Cab L (long) except CODE (SL7) Preinstallation for retrofitting seat/bunk combination BODY 942.899 with CODE (F15) MEGASPACE cab except CODE (SL7) Preinstallation for retrofitting seat/bunk combination

Where it sits

Function group 3 Body › 63 Side wall › 63.10 Side wall — Series 942 (models 899)

EinPAS 35 Body/frame/detachable parts › 35.32 Substructure › 35.32.35 floor assembly/substructure frame — Series 942 (models 899)

EinPAS 35 Body/frame/detachable parts › 35.34 Sidewall › 35.34.35 Fender/sidewall — Series 942 (models 899)

EinPAS 35 Body/frame/detachable parts › 35.34 Sidewall › 35.34.41 Carrier/wheel well — Series 942 (models 899)

AR63.10-W-0807-02A

Prepare side wall, longitudinal member and floor panel connection surfaces for installation

Commercially available tools

Number

Designation

WH58.30-Z-1001-03A

Round wire brush, braided, dia. 70 mm

WH58.30-Z-1024-04A

Abrasive disk, dia. 115 mm, 80 m/s (max. 13,250 rpm)

WH58.30-Z-1001-40A

Tarp (fire-resistant)

Workshop equipment

WE58.40-Z-1001-03A

Drill (electric/pneumatic)

WE58.40-Z-1003-03A

Angle grinder (electric/pneumatic)

WE58.40-Z-1005-03A

Wet/dry vacuum cleaner

Repair materials

Number

Designation

Order number

BR00.45-Z-1001-07A

Zinc dust paint suitable for spot welding

A 000 986 34 42

Prepare side wall, longitudinal member and floor panel connection surfaces for  
	installation

W63.10-1044-09

1 Grind connection surfaces in areas A to F down to bare metal on one side.

Prepare side wall, longitudinal member and floor panel connection surfaces for  
	installation

W63.10-1047-06

2 Grind connection surfaces in areas G to L down to bare metal on both sides.

3 Grind connection surfaces in areas M to R down to bare metal on one side.

Prepare side wall, longitudinal member and floor panel connection surfaces for  
	installation

W63.10-1046-09

4 Grind connection surfaces in areas S to U down to bare metal on both sides.

5 Grind spot welding flange in shaded areas down to bare metal on both sides. Coat insides of spot weld flanges with zinc dust paint.

Prepare side wall, longitudinal member and floor panel connection surfaces for  
	installation

W63.10-1045-04

6 Grind connection surfaces in areas V and X down to bare metal on both sides.

7 Grind connection surface in area W down to bare metal on one side.

8 Grind spot welding flange down to bare metal in shaded area on both sides. Coat inside of spot welding flange with zinc dust paint.