ar6310p080004fa

Installing and welding in side wall, C-pillar

Type ar · topic 63.10 · version 0105 · 2006-07-26

Applies to: MODEL 210.2

Where it sits

Function group 3 Body › 63 Side wall › 63.10 Side wall — Series 210 (models 2**)

EinPAS 35 Body/frame/detachable parts › 35.34 Sidewall › 35.34.35 Fender/sidewall — Series 210 (models 2**)

AR63.10-P-0800-04FA

Installing and welding in side wall, C-pillar

Installing and welding in side wall, C-pillar
Installing and welding in side wall, C-pillar

210 589 04 23 00

Set of check of welding gauges

Side portal frame

210 589 17 23 00

Commercially available tools

Number

Designation

WH58.30-Z-1003-01A

Electrode miller

WH58.30-Z-1003-02A

Clamping pliers

WH58.30-Z-1031-02A

C-clamp

WH58.30-Z-1001-03A

Round wire brush, braided, dia. 70 mm

WH58.30-Z-1024-04A

Abrasive disk, dia. 115 mm, 80 m/s (max. 13,250 rpm)

WH58.30-Z-1001-40A

Tarp (fire-resistant)

Workshop equipment

WE58.40-Z-1001-02A

Inert gas welder

WE58.40-Z-1002-02A

Spot welder

WE58.40-Z-1001-03A

Drill (electric/pneumatic)

WE58.40-Z-1003-03A

Angle grinder (electric/pneumatic)

Installing and welding in side wall, C-pillar

P63.10-0546-06

1 Install side wall on C-pillar and fasten to side portal straightening set.

Ensure that spacer plate is installed (sheet metal thickness of rear fender).

2 Fasten remaining connection points with clamps.

3 Weld side wall to C-pillar in area
A - , as well as and .

Installing and welding in side wall, C-pillar

P63.10-0551-06