ar6310d002002h

Prepare front side wall paneling for installation

Type ar · topic 63.10 · version 0102 · 2011-07-18

Applies to: MODEL 900, 906.6 /7 with CODE (D03) Roof and rear-end doors, high version with CODE (D05) Super high roof

Where it sits

Function group 3 Body › 63 Side wall › 63.10 Side wall — Series 900 · Series 906 (models 6**, 7**)

EinPAS 35 Body/frame/detachable parts › 35.34 Sidewall › 35.34.35 Fender/sidewall — Series 900 · Series 906 (models 6**, 7**)

EinPAS 35 Body/frame/detachable parts › 35.34 Sidewall › 35.34.38 Left panel — Series 900 · Series 906 (models 6**, 7**)

EinPAS 35 Body/frame/detachable parts › 35.34 Sidewall › 35.34.39 Right panel — Series 900 · Series 906 (models 6**, 7**)

AR63.10-D-0020-02H

Prepare front side wall paneling for installation

Prepare front side wall paneling for installation

D63.10-1416-06

The following operation steps are shown on the left front side wall paneling (1) for model 906.733 and must be performed analogously on the right side if damaged.

1 Scribe separation line on front side wall paneling (1) (area A).

2 Cut front side wall paneling (1) at separation point (area A).

Dimensions:

a approx. 25 mm

3 Drill Ø 7 mm holes in front side wall paneling (1) (area D).

4 Grind crosshatched areas on front side wall paneling (1) down to bare metal around holes.

5 Grind mating surfaces on front side wall paneling (1) down to bare metal in crosshatched areas.

Grind spot weld flanges down to bare metal on both sides.

6 Coat insides of spot weld flanges with zinc dust paint.

Prepare front side wall paneling for installation

D63.10-1420-09

7 Punch Ø 6 mm holes in front side wall paneling (areas B and C).

8 Grind crosshatched areas on front side wall paneling down to bare metal around holes.

9 Grind mating surfaces on front side wall paneling down to bare metal in crosshatched areas.