ar6220p120004e

Preparing connection points on body and wheelhouse

Type ar · topic 62.20 · version 0108 · 2006-07-25

Applies to: MODEL 202.0 /1, 208.3 /4

Where it sits

Function group 3 Body › 62 Front end and fire wall › 62.20 Wheelhouse — Series 202 (models 0**, 1**) · Series 208 (models 3**, 4**)

EinPAS 35 Body/frame/detachable parts › 35.30 Front end › 35.30.35 Carrier/wheel well — Series 202 (models 0**, 1**) · Series 208 (models 3**, 4**)

AR62.20-P-1200-04E

Preparing connection points on body and wheelhouse

Commercially available tools

Number

Designation

WH58.30-Z-1002-02A

Hole punching pliers, dia. 7 mm

WH58.30-Z-1001-03A

Round wire brush, braided, dia. 70 mm

Workshop equipment

WE58.40-Z-1004-03A

Body saw (electric/pneumatic)

Preparing connection points on body and wheelhouse

P62.20-0249-06

1 Separate remaining wheelhouse panel (35) along dotted line with body saw (arrows).

Preparing connection points on body and wheelhouse

P62.20-0251-06

2 Cut off remaining wheelhouse panel (35) at bottom along dotted line with tin snips (arrows).

3 Punch three 7 mm dia. holes in remaining wheelhouse panel (35) with hole punching pliers (arrows).

Preparing connection points on body and wheelhouse

P62.20-0254-06

4 Cut welding flange (36) off of wheelhouse (1) along dotted line with tin snips (arrows).