115 589 03 59 00
Long wedge
Remove
1 | Clean high-voltage distributor (20) and power electronics control unit (N129/1) thoroughly. |
Ensure absolute cleanliness; no dirt particles must enter the components. |
2 | Remove screws/bolts (7, 6x). |
3 | Pry off high-voltage distributor (20) with two long wedges evenly from the power electronics control unit (N129/1) and remove. |
Detach high-voltage distributor (20) evenly and without rotating or tilting. |
P54.10-3869-11
Installing
4 | Clean contact and sealing surfaces on high-voltage distributor (20) and power electronics control unit (N129/1). |
Check for absolute cleanliness. |
5 | Install new seal (8). |
6 | Remove screws/bolts (7, 6x) as far as possible out of the high-voltage distributor (20). |
7 | Connect up high-voltage distributor (20) and power electronics control unit (N129/1) evenly and without rotating or tilting until their sealing surfaces fit closely together. |
High degree of force and aid of helper required! |
P54.10-3870-11
8 | Tighten bolts (7) in numbered sequence finger-tight. |
9 | Tighten bolts (7) in numbered sequence to specified torque . |
P54.10-3871-11