Before the following work instructions are started, the DC/DC converter control unit (N83/1) must be completely freed of old thermal compound and cleaned.
1 | Mark fill level of thermal compound on double cartridge (1). |
2 | Break off latch (2) and open double cartridge (1) by doing so. |
Note maximum of 1 h processing time. |
3 | Screw mixing spout (3) onto double cartridge (1). |
4 | Insert double cartridge (1) into commercially available 50 ml double-cartridge gun and completely fill mixing spout with thermal compound |
P54.10-4636-12
5 | Apply half of the cartridge contents, approx. 6.2 ml, onto DC/DC converter control unit (N83/1). Area (B). |
6 | Apply 60 % of remaining cartridge contents, approx. 4.1 ml, onto DC/DC converter control unit (N83/1). Area (A). |
7 | Apply remaining cartridge contents, approx. 2.6 ml, onto DC/DC converter control unit (N83/1). Area (C). |
Approx. 2.1 ml of thermal compound is left in the mixing spout. |
P54.10-4633-06