L32.20-0016-11
1 Front torsion bar
2 Bolt
3 Bracket
4 Rubber bushing
5 Link rod
6 Nut
7 Nut
8 Suspension strut
9 Front axle carrier
| Remove/Install | ||
| Notes on self-locking nuts and bolts | All models | |
1 | Remove front wheels | Provides easier access. | |
| Remove/install wheels, rotate if necessary | ||
2 | Remove nut (6) holding link rod (5) to front torsion bar (1) and nut (7) holding link rod (5) to suspension strut (8) and remove link rod (5). | Installation: Do not twist or damage rubber boot. The ingress of dirt could damage the ball joint. The link rods (5) with M10 thread must be replaced with new rods after each disassembly. Counter the ball head bolts on the link rods (5). Check link rods (5) with M12 thread and replace if necessary. | |
| |||
| |||
3 | Remove bolts (2) and detach bracket (3) from front axle carrier (9). | | |
4 | Pull rubber bushing (4) off front torsion bar (1). | Installation: Do not use grease or sliding compound. | |
5 | Install in the reverse order |
Front axle torsion bar
Number | Designation | Model | |||
BA32.20-P-1001-02F | Bolt, torsion bar to front axle carrier | Nm | 28 | ||
BA32.20-P-1004-02F | Self-locking nut, link rod to torsion bar | M10 | 1st stage | Nm | 40 |
2nd stage | Nm | - 40 | |||
3rd stage | Nm | 30 | |||
4th stage | ° | 35 | |||
M12 | Nm | 90 | |||
BA32.20-P-1005-02F | Self-locking nut, link rod to suspension strut | M10 | 1st stage | Nm | 40 |
2nd stage | Nm | - 40 | |||
3rd stage | Nm | 30 | |||
4th stage | ° | 35 | |||
M12 | Nm | 90 | |||
Referenced documents
- ah0000n000101a Notes on self-locking nuts and bolts
- ap4010p4050z Remove/install wheels, rotate if necessary