AR26.50-G-2001A | Remove/install and adjusting main shaft and countershaft | 11.11.11 |
TRANSMISSION 711.612
D26.50-0084-09
1 Hexagon socket head screw
2 Cover
3 Front section of transmission housing
3.1 Adjusting disk
4 Reverse idler shaft bolts
5 Reverse idler shaft
6 Synchronizer cone
14 Shift rail lock bolts
16 Pulse star
17 Hexagon bolt
18 Needle roller bearing
19 Setting rings (only with power takeoff)
7 Synchronizer ring
8 Main shaft
9 Countershaft
10 Tapered roller bearing
11 Tapered roller bearing
12 Shift rails
13 Rear section of transmission housing
| Removing | ||
1 | Remove transmission | ||
| Disassemble | ||
2 | Disassemble transmission housing | ||
3 | Remove synchronizer cone (6) and synchronizer ring (7) of 4th gear. | The synchronizer cone (6) and synchronizer ring (7) cannot always be removed. | |
4 | Remove needle roller bearing (18). | ||
5 | Remove tapered roller bearing (10) | ||
6 | Remove main shaft, shift rails and countershaft with collecting box | Remove collecting box inserts. | |
Collecting box | |||
Adjust | |||
7 | Adjust main shaft bearing play | ||
Feeler gauge | |||
| Assemble | ||
8 | Put shift rails together | The cutouts (arrow) must align. | |
9 | Install main shaft with shift rails and countershaft in rear section of transmission housing | As of approx. 10/97 the bolt holes in the rear section of the transmission housing have been modified. To locate the centering device the bore to locate the stepped parallel pin must be drilled to dia. 9.6 to a depth of 10 mm starting from the housing separating surface. | |
Centering device | |||
Synchronizer ring holder | |||
Press-in tool | |||
10 | Insert tapered roller bearing (10) | ||
11 | Insert synchronizer cone (6) and synchronizer ring (7) of 4th gear. | Only if the synchronizer cone (6) and synchronizer ring (7) were removed. | |
12 | Insert needle roller bearing (18) | Coat needle bearing with long-term grease. | |
13 | Assemble transmission housing | ||
14 | Adjust axial play of countershaft | ||
Countershaft axial play | |||
Bearing cap | |||
Tensioning device | |||
Depth gage | |||
Omnifit FD 3041 sealant | |||
| Install | ||
15 | Install transmission |
Gear set adjustment values
Number | Designation | Transmission 711.612/613 | ||
BE26.50-N-1001-01D | Axial play between main shaft bearing and retaining ring | mm | 0,02-0,08 | |
BE26.50-N-1003-01D | Axial play between countershaft and tensioning device | 0 (-0.06/+0.02) | ||
Transmission housing
Number | Designation | Trans-mission | |
BA26.40-N-1005-01A | Bolt, bearing cap to transmission housing | Nm | 21 |
Shift mechanism
711 589 00 43 00
Insertion sleeve
Press-in tool
Collecting box
Synchronizer ring holder
711 589 01 63 00
711 589 00 43 03
711 589 00 63 00
711 589 02 31 00
Tensioning device
Centering device
711 589 03 63 00
Repair materials
Number | Designation | Order number |
BR00.45-Z-1012-01A | Sealant, Omnifit FD 3041 | A 002 989 47 20 10 |
BR00.45-Z-1001-06A | Long-life grease | A 000 989 63 51 11 |
Referenced documents
- ar2610g0020b Remove/install transmission
- ar2640g2002a Disassemble/assemble transmission housing
- ar2650g200101a Adjusting main shaft bearing play
- ar2650g200102a Adjust axial play of countershaft
- ar2650g200202a Install main shaft with shift rails and countershaft in rear section of transmission housing
- ar2650g200203a Removing main shift, shift rails and countershaft