1 | Electric harness of the engine |
3 | Charge air intake manifold |
4 | Charge air tubes |
5 | Seal |
G09.41-3102-05
1 | Electric harness of the engine |
3 | Charge air intake manifold |
6,8 | Bolt |
B111 | Charge air combined sensor (temperature, pressure) |
B09.41-A003-06
| Remove/install | ||
1 | Remove the charge air tubes (4) |
| |
Installation: Clean the sealing surface at the charge air manifold (3). | |||
2 | Remove the head |
| |
3 | Remove the coolant intake tubes from the exhaust gas recirculation |
| |
4 | Remove the coolant return tubes from the exhaust gas recirculation |
| |
5 | Unscrew the gas recirculation bolt (6) from the support of the exhaust gas cooler at the charge air manifold (3) | ||
6 | Unfasten the engine wiring harness (1) at the supercharge air combined sensor (temperature, pressure) (B111) and detach it | ||
7 | Unscrew the bolts (8) and remove the charge air manifold (3) from the head | install: Clean the sealing surfaces, replace the gaskets (5) and pay attention to the installation position. | |
.Intake manifold to cylinder head | |||
8 | Remove the supercharge air combined sensor (temperature, pressure) (B111) | Only if the charge air manifold (3) is replaced. | |
9 | Install in reverse order |
Referenced documents
- ar0120b5014dd Remove/install cylinder head cover
- ar0941b1311dd Remove/install charge air pipe
- ar2020b745401dd Remove/install coolant feed pipe of exhaust gas recirculation
- ar2020b745402dd Remove/install coolant return pipe of exhaust gas recirculation