ar0500d2011a

Removing, installing hydraulic valve clearance compensation elements (bucket tappets)

Type ar · topic 05.00 · version 0100 · 1997-05-13

Applies to: ENGINE 601.943, 602.980 /984 /985

Where it sits

Function group 1 Engine › 05 Engine timing › 05.00 General — Series 601 (models 943) · Series 602 (models 980, 984, 985)

EinPAS 15 Engine › 15.17 Engine timing › 15.17.30 Valve train — Series 601 (models 943) · Series 602 (models 980, 984, 985)

AR05.00-D-2011A

Removing, installing hydraulic valve clearance compensation elements (bucket tappets)

30.12.96

ENGINE 601.943, 602.980 /984 /985

Removing, installing hydraulic valve clearance compensation elements (bucket    
	tappets)
Removing, installing hydraulic valve clearance compensation elements (bucket    
	tappets)

D05.00-0002-01

1 Valve clearance compensation element

3 Oil gallery in cylinder head

4 Seal

5 Screw plug

D05.00-0003-01

Removing, installing

1

Remove camshaft

AR05.20-D-6292A

2

Pull out compensation element (1)

Installation: re-install compensation elements (1) which are not replaced, at the same point.
Oil compensation elements (1).

*102589034000

3

Remove screw plug (5) and blow compressed air into the oil gallery (3).

When doing this, inspect the outlet drillings (arrows) at the seat of the valve plunger to ensure they are clear.

Installation: replace seal (4).

4

Install in the reverse order

Removing, installing hydraulic valve clearance compensation elements (bucket    
	tappets)

Magnetic lifter

102 589 03 40 00

Referenced documents