Turbocharger
Number | Designation | Engine 122.9 | ||
BA09.40-P-1011-01L | Bolt for oil pressure line bracket on bracket | Nm | 10 | |
Charge air pipe/charge air cooling
Number | Designation | Engine | ||
BA09.41-P-1005-01L | Bolt for throttle valve actuator on intake manifold | Nm | 13 | |
Vent and bleeding valve
Number | Designation | Engine 122.9 | ||
BA47.31-P-1001-01B | Bolt of activated charcoal filter shutoff valve | Nm | 5 | |
P01.00-2790-07
1 Detach refrigerant compressor connector (A9x1) and unclip clip (2).
2 Unscrew nut (3) and remove ground line (1).
P01.00-2791-09
3 Detach connector (4) at throttle valve actuator.
4 Detach connector (5) at adjustable camshaft timing solenoid.
5 Detach connector (6) at the fuel injection valves.
6 Detach connector (7) at pressure regulator valve.
7 Detach connector (8) at activated charcoal filter shutoff valve (Y58).
8 Detach connector (10) at camshaft Hall sensor.
9 Detach connector (15) at wastegate valve.
10 Detach connector (16) at coolant temperature sensor.
11 Unscrew bolt on bracket (9) and remove bracket (9).
12 Unscrew bolt (11) and remove ground line (12).
13 Unscrew bolt (13).
14 Unscrew bolts (14) and put aside bracket of wastegate valve with the connected hoses.
15 Unscrew bolts on bracket (17).
16 Unscrew bolts on pressure regulator valve.
17 Pull pressure regulator valve out of the charge air distribution pipe and put aside with connected hose and bracket (17).
Replace sealing ring of pressure regulator valve.
18 Put aside complete wiring harness.
19 Connect in opposite order.