gf9800u2120a

Cathodic dip priming, Sindelfingen plant

Type gf · emne 98.00 · version 0101 · 2000-09-25

Gælder for: MODEL 140, 202.02 /12, 203, 210, 215, 220

Ikke tilgængelig på “da”; vises på Amerikansk-engelsk.

Placering

Funktionsgruppe 3 Karrosseri › 98 Lakering › 98.00 Generelt — Serie 140 · Serie 202 (modeller 02*) · Serie 203 · Serie 210 · Serie 215 · Serie 220

GF98.00-U-2120A

Cathodic dip priming, Sindelfingen plant

6.9.00

MODEL 140, 202.02 /12, 203, 210, 215, 220

Cathodic dip priming, Sindelfingen plant

P98.00-0684-06

Process sequence

Material:
Cataphoretic electro-dipcoat primer

Processing method:
Refer to process sequence

Layer thickness: 18 - 22 μm

Stoving conditions:
Target temperature of 175°C, 15 min.

Function:

- Long-term corrosion protection

- High level of cover for complete cavity coating

- Good resistance of a complete paint system to stone chips

- Faultless adhesion for subsequent coating materials

1 Cataphoretic immersion priming
continuous flow immersion bath

2 Recirculate nozzle scrolls

3 Recirculate 1, immersion rinsing

4 Recirculate 2, spray rinsing

5 Pure filtrate, immersion rinsing

6 Pure filtrate, nozzle scrolls

7 Demineralized water nozzle scrolls

8 Drier

Process sequence of cataphoretic immersion priming coating

Cataphoretic immersion priming, general / Cataphoretic immersion priming, plants

GF98.00-U-2020A

Henviste dokumenter