Shown on model 613.368 |
1 | Refrigerant compressor |
2 | Pressure-side testing and filling valve |
3 | Intake-side testing and filling valve |
4 | Pressure-side shutoff valve |
5 | Intake-side shutoff valve |
7 | Inspection glass |
8 | Filling screw |
T83.55-0027-11
Shown on model 613.367 |
1 | Refrigerant compressor |
2 | Pressure-side testing and filling valve |
3 | Intake-side testing and filling valve |
4 | Pressure-side shutoff valve |
5 | Intake-side shutoff valve |
7 | Inspection glass |
8 | Filling screw |
T83.55-0028-11
Correct oil level | |||
Danger | Risk of explosion caused by welding or soldering work on closed air conditioning system. Risk of poisoning caused by inhaling overheated refrigerant vapors. Risk of injury to skin and eyes caused by contact with liquid refrigerant. | Never perform welding work on or near a closed air conditioning system. No smoking or open flames. Wear safety glasses and protective gloves. Work only in well ventilated areas. Carry out repair work on the air conditioning system circuit only after the system has been drained. | |
Topical note | Protect air conditioning circuit and components from moisture when carrying out repair work | ||
Notes on handling refrigerant R134a | |||
1 | Remove protective cap from pressure-side testing and filling valve (2) and from intake-side testing and filling valve (3) | ||
2 | Connect pressure and suction line of A/C suction and recycling equipment to pressure-side testing and filling valve (2) and intake-side testing and filling valve (3) | Pay attention to the operating instructions of the A/C suction and recycling equipment. | |
3 | Remove protective cap from pressure-side shutoff valve (4) and protective cap from intake-side shutoff valve (5) | ||
4 | Screw in pressure-side shutoff valve (4) and intake-side shutoff valve (5) completely | Screwing in the pressure-side shutoff valve (4) and the intake-side shutoff valve (5) completely opens the pressure-side testing and filling valve (2) and the intake-side testing and filling valve (3). | |
5 | Extract refrigerant from refrigerant compressor (1) using A/C suction and recycling equipment | Note the following: | |
6 | Open filling screw (8) | ||
7 | Fill missing quantity of oil into refrigerant compressor (1) | ||
| Compressor oils (specification 362.0) | ||
| |||
Pour oil into refrigerant compressor (1) until the oil level is near the top of the inspection glass (7). | |||
8 | Install filling screw (8) with new seal | Bolt, refrigerant compressor oil replenishment | |
Torque wrench | |||
9 | Evacuate refrigerant compressor (1) | Evacuate refrigerant compressor (1) to maximum achievable vacuum, but for at least 30 minutes. | |
10 | Unscrew pressure-side shutoff valve (4) by 3 to 5 turns | ||
11 | Pour refrigerant into system via pressure-side testing and filling valve (2) | Only the quantity noted down during extraction. | |
12 | Close valve of A/C suction and recycling equipment | ||
13 | Unscrew pressure-side shutoff valve (4) and intake-side shutoff valve (5) completely | Unscrewing the pressure-side shutoff valve (4) and the intake-side shutoff valve (5) completely closes the pressure-side testing and filling valve (2) and the intake-side testing and filling valve (3). | |
14 | Attach protective cap to pressure-side shutoff valve (4) and protective cap to intake-side shutoff valve (5) | ||
15 | Remove A/C suction and recycling equipment | ||
16 | Attach protective cap to pressure-side testing and filling valve (2) and to intake-side testing and filling valve (3) | ||
17 | Close liftgate |
000 589 64 21 00
Torque wrench
Henviste dokumenter
- ah8330n000301a Oplysninger om håndtering af kølemidlet R134a
- ah8330n000501a Klimaanlæggets kredsløb og komponenter skal beskyttes mod fugt ved reparationer
- as8300z000101a Fare for eksplosion ved svejse- og loddearbejde på det lukkede klimaanlæg. Fare for forgiftning ved indånding af overophedet kølemiddeldamp. Fare for personskade ved hud- og øjenkontakt med flydende kølemiddel
- bb0040p036200a