The superordinate service document as well as the safety information in the service document must be observed.
The following commercially available tools are required to perform operation steps: Rotary wire brush, spot weld milling cutter, wet/dry vacuum cleaner.
1 | Expose and cut off spot welds on center roof paneling (areas A, B, C, D, E, F, G, W, X, Y, Z). |
2 | Remove damaged roof paneling. |
W65.10-1040-05
3 | Sand down to bare metal connection surfaces in the cross-hatched areas on both sides. |
4 | Grind the mating surfaces down to bare metal on one side (areas H, I, K, L, M, N, O, P, Q, R). |
5 | On the insides of spot weld flanges, apply zinc dust paint. |
6 | Remove shavings and drill chips. |
W65.10-1038-06