ar6310d588603d

Prepare right side wall paneling for installation

Type ar · emne 63.10 · version 0100 · 2006-10-31

Gælder for: MODEL 904.063 /363 /463 /663

Ikke tilgængelig på “da”; vises på Engelsk.

Placering

Funktionsgruppe 3 Karrosseri › 63 Sidevæg › 63.10 Sidevæg — Serie 904 (modeller 063, 363, 463, 663)

EinPAS 35 Karrosseri/ramme/monteringsdele › 35.34 Sidevæg › 35.34.35 Skærm/sidevæg — Serie 904 (modeller 063, 363, 463, 663)

EinPAS 35 Karrosseri/ramme/monteringsdele › 35.34 Sidevæg › 35.34.39 Karrosseridel til højre — Serie 904 (modeller 063, 363, 463, 663)

AR63.10-D-5886-03D

Prepare right side wall paneling for installation

Workshop equipment

WE58.40-Z-1003-03A

Angle grinder (electric/pneumatic)

WE58.40-Z-1004-03A

Body saw (electric/pneumatic)

Repair materials

Number

Designation

Order number

BR00.45-Z-1001-07A

Zinc dust paint suitable for spot welding

A 000 986 34 42

Prepare right side wall paneling for installation

D63.10-1186-06

1 Separate right side wall paneling along front and rear edge with the following dimension (dotted lines):

a = approx. 1 mm.

2 Grind right side wall paneling down to bare metal on both sides in marked area and coat with zinc dust paint.

Prepare right side wall paneling for installation

D63.10-0021-12

3 Hold right side wall paneling (1), align and clamp.