D46.40-1107-11
1 Nut
2 Shield
3 Ball head
4 Jam nut
5 Tie rod
| Remove/install | ||
1 | Lift/jack up vehicle | ||
2 | Remove front wheel | ||
3 | Unscrew nut (1) from ball head (3) and remove shield (2) | Installation: Replace self-locking nut (1). | |
| |||
4 | Slacken lock nut (4) | Installation: Only tighten the jam nut (4) after checking and adjusting the toe-in. | |
| |||
5 | Press ball head (3) off pitman arm | Installation: Clean the taper and contact surfaces of the pitman arm. | |
Puller | |||
6 | Unscrew ball head (3) from the tie rod (5) | ||
7 | Install in the reverse order | ||
8 | Check and adjust front axle toe |
Steering linkage
Number | Designation | Model | Model | |||
BA46.40-N-1001-06D | Nut on ball head | M141.5 | Stage 1 | Nm | 50 | 50 |
Stage 2 | ° | 60 | 60 | |||
M161.5 | Nm | - | - | |||
BA46.40-N-1003-06D | Lock nut at ball head | Nm | 65 | 65 | ||
Puller
221 589 05 33 00