ar2645w0009e

Remove/install power take-off 2

Type ar · emne 26.45 · version 0100 · 2014-04-28

Gælder for: TRANSMISSION 715.352/360/371/381/508/518/523/528/571 with power take-off 135

Ikke tilgængelig på “da”; vises på Engelsk.

Placering

Funktionsgruppe 2 Chassis › 26 Manuel gearkasse › 26.45 Kraftudtag, kraftudtagsdrev

EinPAS 17 Drivstreng/aksel › 17.45 Kraftudtag › 17.45.30 Kraftudtag komplet

Gælder også for motorer/gearkasser: 715 352, 715 360, 715 371, 715 381, 715 508, 715 518, 715 523, 715 528, 715 571

AR26.45-W-0009E

Remove/install power take-off 2

14.04.2014

TRANSMISSION

715.352/360/371/381/508/518/523/528/571

with power take-off 135

Remove/install power take-off 2

Shown with power take-off 135-11b/1b and power take-off 135-11b/1c

1

Seal

2

Shim

3

Power take-off 2

4

Seal

5

Threaded rod

6

Bearing housing with output flange

7

Nut

8

Hydraulic pump

S3

Power take-off 2 indicator switch

W26.45-1353-06

Remove/install power take-off 2

Shown with power take-off 135-11b/2c

1

Seal

2

Shim

3

Power take-off 2

4

Seal

5

Threaded rod

7

Nut

8

Hydraulic pump

S3

Power take-off 2 indicator switch

W26.45-1354-06

Notes on self-locking nuts and bolts

AH00.00-N-0001-01A

Notes on compressed air connection systems

AH00.18-N-0001-01A

Remove/install

1

Remove propeller shaft on bearing housing with output flange (6)

Only on power take-off without hydraulic pump.

Propeller shaft to power take-off

*BA26.45-N-1011-04E

2

Disconnect electrical connector from power take-off 2 indicator switch (S3)

3

Detach compressed-air line

4.1

Remove bearing housing with output flange (6)

On power take-off without hydraulic pump

Collect oil which runs out in a suitable container.

Installation: Clean sealing surfaces and replace seal (4).

Nut, second power take-off to power take-off

*BA26.45-N-1013-04E

4.2

Detach hydraulic pump (8)

On power take-off with hydraulic pump

AR26.45-W-0002EA

Collect oil which runs out in a suitable container.

Installation: Clean sealing surfaces and replace seal (4).

5

Remove power take-off 2 (3) and shim (2)

Collect oil which runs out in a suitable container.

Installation: Clean sealing surfaces and replace seal (1).

6

Install in the reverse order

7

Check transmission oil level, adjust to correct level if necessary

Model 963, 964

AP26.00-W-2601H

Model 967

AP26.00-W-2601K

Power take-off

Number

Designation

Transmission 715 with PTO 135

BA26.45-N-1011-04E

Propeller shaft to power take-off

M8

Nm

25

M10

Nm

60

M12

Nm

100

Power take-off

Number

Designation

Transmission 715 with PTO 135

BA26.45-N-1013-04E

Nut, second power take-off to power take-off

Nm

70

Henviste dokumenter