ad7750p200025a

Summary chart, energizing of solenoid valves for vario roof opening procedure

Type ad · emne 77.50 · version 0100 · 2003-06-12

Gælder for: MODEL 170

Ikke tilgængelig på “da”; vises på Engelsk.

Placering

Funktionsgruppe 3 Karrosseri › 77 Soltag, kaleche, opsats › 77.50 Coupé-tag — Serie 170

EinPAS 38 Tagsystem › 38.20 kaleche/coupétag/variotag › 38.20.1 Grundinformation — Serie 170

AD77.50-P-2000-25A

Summary chart, energizing of solenoid valves for vario roof opening procedure

Vario roof opening procedure

Actuated limit switches

HHT test

ON corresponds to 11-14 V

OFF corresponds to 0-1 V

Relay (A/5k1)

Vario roof solenoid valve (A7/5y1)

Trunk lid cylinder (A7/5y2)

Socket box connection diagram

22

24

25

Retract side windows, release trunk lid, open, release vario roof

11-14 V

11-14 V

11-14 V

Open vario roof, retract front side windows

11-14 V

0-1 V

11-14 V

Close trunk lid, lock, lock vario roof

11-14 V

0-1 V

0-1 V

Post-lock for t = 2 s, retract rear side windows for t = 2 s

11-14 V

0-1 V

0-1 V

Raise front side windows

0-1 V

0-1 V

0-1 V