Correct installation position of clamp on coolant line
Typ sm · téma 20.20 · verze 0100 · 2017-03-02
Platí pro: Model 963.### 2# , 964.### 2# with engine 471.9 with code D6M (Warm water auxiliary heater, cab) with code F2P (Cab, 765 mm attachment height) except code B3H (Water-type secondary retarder) Code: AGB-SCHELL
Není k dispozici v jazyce „cs“; zobrazeno v jazyce Angličtina.
Correct installation position of clamp on coolant line
15.02.2017
Model
963.### 2# , 964.### 2# with engine 471.9
with code D6M (Warm water auxiliary heater, cab)
with code F2P (Cab, 765 mm attachment height)
except code B3H (Water-type secondary retarder)
Code: AGB-SCHELL
Operation no. of the operation texts or standard texts and flat rates
Category
Op. no.
Operation text
Time
Acc. no.
Code
N
029763
Correct installation position of clamp on coolant line
0,2 h
50 910 72
AGB-SCHELL
W20.20-1205-09
1
Spring-loaded band-type clamp
4
Tab
2
Coolant hose
5
Serrated ring
3
Vent line
Correct
1
Open maintenance flap
2
Turn shackles (4) of spring bracket clamp (1) in opposite direction of travel
This ensures that the maximum gap between the spring bracket clamp (1) and bleed line (3) is given. Use commercially available pliers for spring bracket clamps.
3
Fit new toothed ring (5) level with spring bracket clamp (1) on bleed line (3)