AR83.30-T-1762AB | Evacuating air conditioning system, leak test | 16.6.03 |
MODELS NMB671.030 with CODE (HKC) Sütrak AC 353 air conditioning without roof heater
T83.30-0081-11
1 Pressure-side testing and filling valve
2 Pressure gage
3 Suction-side testing and filling valve
Modification notes
Evacuating | |||
Danger! | Risk of explosion from welding or soldering work on closed air conditioning system. Risk of poisoning from inhaling overheated refrigerant vapors. Risk of injury to skin and eyes caused by contact with liquid refrigerant. | Never perform welding work on or near a closed air conditioning system. No smoking or open flames. Wear safety glasses and protective gloves. Work only in well ventilated areas. Carry out repair work on the air conditioning system circuit only after the system has been discharged. | |
| Notes on handling refrigerant R134a | Air conditioning with refrigerant R134a | |
1 | Open electromagnetic shutoff valve | Manual opening | |
Electrical opening | |||
2 | Screw off caps above the pressure-side testing and filling valve (1) and the suction-side testing and filling valve (3) | ||
3 | Connect pressure and suction line of air conditioning vacuum and recycling unit to the pressure-side testing and filling valve (1) and to the suction-side testing and filling valve (3) | Observe the operator's manual of the air conditioning vacuum and recycling unit. | |
| |||
4 | Screw shutoff valve into suction-side testing and filling valve (3) 2 to 5 turns | Remove cap above shutoff valve. | |
5 | Evacuate air conditioning system | Evacuate air conditioning system circuit until maximum possible vacuum has been reached, but for no less than 8 hours. | |
Leak test | |||
6 | Switch off air conditioning vacuum and recycling unit | Close valves of air conditioning vacuum and recycling unit. Closing the valves prevents an incorrect leak test of the air conditioning vacuum and recycling unit. | |
7 | Read off vacuum indication on pressure gauge (2) of air conditioning vacuum and recycling unit | Note vacuum pressure value | |
8 | Read off vacuum indication on pressure gauge (2) again after a waiting time of 10 minutes | Compare current vacuum value to the recorded vacuum value. If a drop in vacuum is detectable: | |
Fill air conditioning without performing leak test After filling the air conditioning system, check for leaky areas: | |||
Inspect the refrigeration circuit for leaks. Before repairing leaky area empty air conditioning system: | |||
Discharge air conditioning system Check for leaky areas again after the repair work: | |||
Repeat steps 1 to 8. | |||
9 | Fill air conditioning system | Do not evacuate nor perform leak test. |
Workshop equipment
WE58.40-Z-1002-22A | Air conditioning service station |
Odkazované dokumenty
- ah8330n000301a Pokyny k manipulaci s chladivem R134a
- ar8330t120901c
- ar8330t1777ab
- ar8330t1780ab
- ar8330t1780ab
- ar8330t5460aa
- ar8330t5470bac
- as8300z000101a Nebezpečí exploze při svářečských nebo pájecích pracích na uzavřené klimatizaci. Nebezpečí otravy při vdechnutí přehřátých výparů chladiva. Nebezpečí poranění při kontaktu očí a kůže s tekutým chladivem