P77.50-0298-06
1 Slide
2 Cam
3 Bolt
4 Pin
Adjustment | |||
1 | Remove C-pillar paneling on vario-roof and close vario-roof | ||
2 | Push slide (1) up in direction of arrow and release | Interval between pin (4) and oblong hole in slide (1) 2-3 mm | |
3 | Loosen screw (3) | ||
4 | Adjust cam (2) | Turn cam (2) to left or right to obtain interval of 2-3 mm after releasing slide (1) | |
5 | Open and close vario-roof a number of times | If the vario-roof is subjected to excessive pressure downward in the area of the separation joint between the front section and rear section of the roof when locking, | |
adjust stop buffer on vario-roof | |||
6 | Install C-pillar paneling on vario-roof |