ar7720p100002eb

Installing tilting/sliding roof panel

Typ ar · téma 77.20 · verze 0103 · 2000-10-04

Platí pro: MODEL 202 with CODE (414a) Glass electric tilting/sliding roof

Není k dispozici v jazyce „cs“; zobrazeno v jazyce Angličtina.

Zařazení

Funkční skupina 3 Nástavba › 77 Posuvné střešní okno, skládací střecha, nástavce › 77.20 Elektrické posuvné střešní okno — Řada 202

EinPAS 38 Střešní systém › 38.15 Posuvné střešní okno / panoramatické střešní okno › 38.15.33 Vnější plechy / kryt posuvného střešního okna — Řada 202

AR77.20-P-1000-02EB

Installing tilting/sliding roof panel

Electrically operated glass tilting/sliding roof (code 414a)

Test and adjustment values for tilting/sliding roof

Number

Designation

Model 202

BE77.20-P-1001-01A

Joint gap

Front of tilting/sliding roof panel

mm

0,15

Side and rear of tilting/sliding roof panel

mm

0,30

Installing tilting/sliding roof panel
Installing tilting/sliding roof panel

Special tools

140 589 04 21 00

140 589 00 37 00

Installation pliers

Adjustment gauge (2 each)

Installing tilting/sliding roof panel

P77.20-0012-01

1 Insert adjustment gauge (7) into holder (8) and arrest in direction of arrow.

Note
The adjustment gauge (7) ensures that the holder (8) and tilting/sliding roof (1) are positioned properly when installed.

Installing tilting/sliding roof panel

P77.20-0016-01

2 Position tilting/sliding roof panel (2) and screw on nuts (3) loosely.

Installing tilting/sliding roof panel

P77.20-0019-01

Note
It is necessary to grind or file a notch in the installation pliers (9) to prevent the tilting/sliding roof (2) from slipping out of the installation pliers (9) when it is tensioned.

Dimension A 5 mm

Depth 1 mm

Installing tilting/sliding roof panel

P77.20-0017-01

3 Slightly tension tilting/sliding roof panel (2) with installation pliers (9) and tighten nut (3).

4 Remove adjustment gauge (7) and installation pliers (9).

5 Check tilting/sliding roof for proper function.

6 Check joint gaps around closed tilting/sliding roof panel (2) from outside.

7 Reinstall rubber bellows (6).

8 Reinstall molding (5).