Workshop equipment
WE58.40-Z-1001-03A | Drill (electric/pneumatic) |
D62.40-0005-11
The following steps apply for the right side of the of waist rail paneling (1) and must be performed on the left side with locations reversed.
1 Mark holes with the following gaps:
a = 25 mm,
b = 15 mm,
c = 11 mm.
2 Drill all marked holes with 6 mm dia. bit.
D62.40-0006-04
3 Grind waist rail paneling (1) down to bare metal in marked area (6) and coat with zinc dust paint.
4 Fit waist rail paneling, align and clamp.