ar4260b001901a

Testing and adjusting the distribution valve

Typ ar · téma 42.60 · verze 0100 · 2016-02-12

Platí pro:

Není k dispozici v jazyce „cs“; zobrazeno v jazyce Angličtina.

Zařazení

Funkční skupina 2 Podvozek › 42 Brzdy - hydraulická část a mechanická část › 42.60 Vzduchotlaková část — Řada 693 · Řada 904 (modely 925)

EinPAS 21 Brzdy/podtlakový systém/vzduchotlaké zařízení › 21.35 Vzduchotlaké zařízení › 21.35.13 Potrubí/hadice/ventil — Řada 693 · Řada 904 (modely 925)

AR42.60-B-0019-01A

Testing and adjusting the distribution valve

Testing and adjusting the distribution valve

B42.60-0257-12

1 - Workbench accessories

D = Pressure reducing valve.

FN1= FN2 = Pressure regulating valve (fine adjustment) with discharge to the atmosphere.

V = Workbench supply pressure gage.

1=2=3=4=7=Pressure gages with 0.1 bar scale divisions, 16 bar capacity.

1L = 1 liter air tank.

20L = 20 liters air tank.

C=V=L=3=4=7= Valves (taps).

(1)=(2)=(3)=(4)=(7)=(L)= Fast connections available on the workbench.

2 - Visual check

Check the valve for external damages.

3 - Connect the valve in test stand

Fast connection 1 (test bench) at port 41

Fast connection 2 (test bench) at port 42

Fast connection 7 (test bench) at port 43

Fast connection (test bench) at port 11

Fast connection 3 (test bench) at port 21

Fast connection 4 (test bench) at port 22

Testing and adjusting the distribution valve

B42.60-0268-08

4 - Test the leak

Operate the tap L clockwise.Operate the tap C until the gage 7 indicates 8.0 bar pressure.

Check the exhaustion port (discharge) for leakage.Shut the tap C and open the lateral tap 7 until the gage 7 indicates a pressure of “0” (zero) bar.

Check the exhaustion port (discharge) for leakage.Shut the lateral tap 7.

Operate the tap C again until the gage 7 indicates 8.0 bar pressure. Operate the valve FN1 until the gage 1 indicates 8.0 bar pressure.

Check the gage 4 that will have to indicate 8.0 bar.Check the exhaustion port (discharge) for leakage.

Deactivate the valve FN1 and actuate the valve FN2 until the gage 2 indicates 8.0 bar.Check the gage 4 that will have to indicate 8.0 bar.

Check the exhaustion port (discharge) for leakage.

Deactivate the valve FN2 until the gage 2 reaches “0” (zero) bar.

Note: In all tightness checking phases, the maximum leakage found will have to be equal or less than 8 cm³ / minute, this equals the Ø of a 25 mm bubble during 1 minute.In the case of leakages it is necessary to disassemble and repair the valve.

5 -Test the operation - Adjust

Service brake (circuit 41):

Operate the valve FN1 until the gage 1 indicates 0.5 bar.Check the pressure on gage 4 which will have to be equal or below 0.5 bar.

Increase the FN1 valve pressure until the gage 1 indicates 2.0 bar.Adjust the valve to a pressure of 2.2 bar on gage 4. This advance can be adjusted by means of an internal setting screw in the valve.

Increase the FN1 valve pressure until the gage 1 indicates 7.3 bar.Check the gage 4 that will have to indicate 7.5 bar.

Deactivate the valve FN1 until the gage 1 reaches “0” (zero) bar.

Service brake (circuit 42):

Actuate the valve FN2 until the gage 2 indicate 0.5 bar pressureCheck the pressure on gage 4 that will have to be equal or below 0.5 bar.

Increase the FN2 valve pressure until the gage 2 indicates 2 bar.Check the gage 4 that will have to indicate 2 bar.

Increase the FN2 valve pressure until the gage 2 indicates 8 bar. Check the gage 4 that will have to indicate 8 bar.

Deactivate the valve FN2 until the gage 2 reaches “0” (zero) bar.

Parking brake (circuit 43)

With a pressure drop in the circuit 43 from 8.0 bar to 6.3 bar a pressure equal or below 0.5 bar will have to be indicated on gage 4.To carry out this test, shut the tap C and slowly open the lateral tap 7 checking the drop in pressure from 8.0 bar to 6.3 bar.

With “0” (zero) bar pressure on gage 7 the gage 4 will have to indicate a pressure above 6.7 bar.Operating the tap C increase the pressure on gage 7 to 0.9 bar. The gage 4 has to present beginning of pressure drop

Increase the pressure on gage 7 to a pressure equal or greater than 7.3 bar. The gage 4 will have to indicate a pressure of “0” (zero) bar.

Operate the tap C until the gage 7 reaches 8 bar.

6 - Test rupture

Should there occur a pressure difference between the port 41 and the supply port 11 caused by the rupture of the trailer brake piping , the 2/2 way valve coupled to the distribution valve restricts the passage from 9 mm Ø to 2 mm.With a pressure of 8.0 bar at port 11, carefully detach the fast coupling (3), operate the FN1 valve and check if a pressure restriction occurs that is released by the valve.

7 - Remove the valve from the test stand

De-pressurize the valve circuits and disconnect the quick coupling from test stand.

Protect the valve connections ports with suitable plastic caps.