Trailer axle 749.306/307/320/321/322/330/335/337/340/347/348 with air suspensionHT250
Trailer axle 749.323/336/345/346 with air suspension HDB
BA35.15-N-1008-02A
Nut, axle link threaded connection
Stage 1
Nm
–
–
Stage 2
°
–
–
Trailing arms, transverse control arms
Number
Designation
Trailer axle 749.306/307/320/323/330/336/345/346 with air suspension DLS
BA35.15-N-1008-02A
Nut, axle link threaded connection
Stage 1
Nm
250
Stage 2
°
270
1
Replace nut (1) and spring bearing pin (4).
Only if the nut (1) and spring bearing pin (4) have not been replaced immediately beforehand. Do not tighten nut (1) yet.
2
Unfasten nut (1).
Only if the nut (1) and spring bearing pin (4) were replaced immediately beforehand.
3
Slide clamping plate retaining bracket (2) forwards or backwards until the specified angular alignment of the axle is adjusted.
Due to an elongated hole in the axle brackets (3), it is possible to move the spring bearing bolts (4) by 6 mm.
G35.20-3113-11
4
Tighten nut (1) to specified tightening torque .
Set normal driving level before tightening nut (1). This prevents damage to the bushings.
If necessary, counterhold spring bearing bolt (4). The threaded connection should be checked annually for strength with the specified test torque. On vehicles with aggravated operating conditions the check should be carried out at correspondingly shorter time intervals.
Odkazované dokumenty
ah0000n005001k Pokyny k postupu utahování šroubových spojů