N05.30-0372-01
Inlet valves
1 Adjustment screw
2 Jam nut
Exhaust valve
1 Adjustment screw
2 Jam nut
N05.30-0307-01
N03.30-0313-01
Inspection hole in timing case
3 Cap
4 Cranking device
S10 Starter switch
S11 Stop switch
N01.00-2048-01
1 | Remove cylinder head cover | ||
| |||
2 | Install turning device (4) for engine | Only carry out if the engine is to be turned with the turning device (4). | |
| |||
| |||
| |||
3 | Check valve clearance (arrow) on all inlet and exhaust valves, adjust if necessary | The engine crankshaft can be turned with the aid of the turning device (4) or by simultaneously pressing the start and stop switch (S10, S11). Check and adjust the valve clearance when the engine is cold, at the earliest 30 minutes after switching off the engine. | |
| |||
| |||
| General information on adjusting valve clearance | Method 1 | |
| General information on adjusting valve clearance | Method 2 | |
4 | Detach turning device (4) for engine | Only carry out when the turning device (4) for turning the engine has been installed. | |
| |||
| |||
| |||
5 | Install cylinder head cover | ||
|
Test values for valves
Number | Designation | Engine Engine | ||
BE05.30-N-1012-01B | Valve clearance | Inlet | mm | 0.40 |
Outlet | mm | 0.60 | ||
BE05.30-N-1013-01B | Test tolerance for valve clearance | Inlet | mm | -0.05/+0.05 |
Outlet | mm | -0.10/+0.10 | ||
Timing case
Number | Designation | Engines | |
BA01.60-N-1002-01A | Inspection hole closure cover to timing case | Nm | 25 |
BA01.60-N-1003-01A | Bolt, turning device to timing case | Nm | 25 |
Engine timing - general
Number | Designation | Engine | |
BA05.00-N-1002-01A | Jam nut on rocker arm adjustment screw | Nm | 25 |
000 589 10 99 00
Tool kit
Cranking device
904 589 04 63 00
Odkazované dokumenty
- ah0530n100001c Všeobecné pokyny pro seřízení vůle ventilů
- ah0530n100001d Všeobecné pokyny pro seřízení vůle ventilů
- ap0530w056001b Kontrola a seřízení vůle ventilů
- ar0120i5014b
- ar0330w160003a Montáž, demontáž otočného/blokovacího zařízení pro motor